Skip to content

Advanced Tests (nightly) #846

Advanced Tests (nightly)

Advanced Tests (nightly) #846

Triggered via schedule December 25, 2024 00:18
Status Failure
Total duration 1h 31m 40s
Artifacts

nightly-tests.yml

on: schedule
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors and 1 warning
build (3.9, 1.5.1)
Process completed with exit code 1.
build (3.8, 1.5.1)
The job was canceled because "_3_9_1_5_1" failed.
build (3.8, 1.5.1)
The operation was canceled.
build (3.10, 1.5.1)
The job was canceled because "_3_9_1_5_1" failed.
build (3.10, 1.5.1)
The operation was canceled.
build (3.12, 1.5.1)
The job was canceled because "_3_9_1_5_1" failed.
build (3.12, 1.5.1)
The operation was canceled.
build (3.11, 1.5.1)
The job was canceled because "_3_9_1_5_1" failed.
build (3.11, 1.5.1)
The operation was canceled.
build (3.9, 1.5.1)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636