Skip to content

Commit

Permalink
2023.11: Add deferred import evaluation topic
Browse files Browse the repository at this point in the history
  • Loading branch information
nicolo-ribaudo authored and ctcpip committed Nov 2, 2023
1 parent 171db76 commit b3b621c
Showing 1 changed file with 4 additions and 2 deletions.
6 changes: 4 additions & 2 deletions 2023/11.md
Original file line number Diff line number Diff line change
Expand Up @@ -116,6 +116,7 @@ When applicable, use these emoji as a prefix to the agenda item topic.
|| stage | timebox | topic | presenter |
|:-:|:-----:|:-------:|-------|-----------|
| | 3 | 30m | Stage 3 update of [Intl Locale Info API](https://github.com/tc39/proposal-intl-locale-info) (Slides TBW) | Frank Yung-Fong Tang |
| | 2 | 30m | [Deferred import evaluation](https://github.com/tc39/proposal-defer-import-eval/): deferred re-exports | Nicolò Ribaudo |
| | 0 | 10m | [JSON.tryParse](https://github.com/Jack-Works/proposal-json-tryParse) for stage 1 | Jack-Works |
| | 0 | 30m | [Module sync assert](https://github.com/Jack-Works/proposal-module-sync-assert) for stage 1 | Jack-Works |

Expand All @@ -137,14 +138,15 @@ When applicable, use these emoji as a prefix to the agenda item topic.

*Schedule constraints should be supplied here **48 hours** before the meeting begins so that the Chairs can take them into account when preparing the schedule.*

- Shu-yu Guo will **only** be available on Nov 27. Ideally, as many (if any) stage 3 advancement items should be on that day. If not, materials should be made available ahead of time.

<!-- Be specific! Provide a full name, date and time range that they will or will not be available, and which sessions they are trying to prioritize. Satisfaction not guaranteed, but more information is useful. Conflicting constraints honored on a first-come, first served basis. -->

#### Normal Constraints

<!-- Constraints supplied more than 48 hours before the meeting should go here -->

- Shu-yu Guo will **only** be available on Nov 27. Ideally, as many (if any) stage 3 advancement items should be on that day. If not, materials should be made available ahead of time.
- Nicolô Ribaudo *prefers* (i.e. consider this a low-priority constraint) to present "Deferred import evaluation" in the morning

#### Late-breaking Schedule Constraints

<!-- Constraints supplied less than 48 hours before the meeting should go here -->

0 comments on commit b3b621c

Please sign in to comment.